New owner quick-start checklist

On this page
Section 1.3Getting started

New owner quick-start checklist

A four-stage checklist (pre-install, assembly, first use, ongoing) with a deep-link into every article that backs it up.

Use this checklist if your sauna has just been delivered. Each item links to a detailed article elsewhere in this help center.

Pre-installation

  • Confirm your foundation is level and rated for your model's loaded weight (Section 4.1 to 4.5)
  • Confirm your electrician is scheduled and the dedicated circuit is planned (Section 4.6 to 4.10)
  • Confirm clearance around the installation site (Section 4.11)
  • Inspect the shipment for damage on arrival (Section 6.4)

Assembly

First use

Ongoing

  • Adopt the after-session routine (Section 10.1)
  • Schedule weekly and monthly care (Section 10.2 and 10.3)
  • Save support contact details for when you need help (Section 15)

Last updated May 3, 2026