New owner quick-start checklist
A four-stage checklist (pre-install, assembly, first use, ongoing) with a deep-link into every article that backs it up.
Use this checklist if your sauna has just been delivered. Each item links to a detailed article elsewhere in this help center.
Pre-installation
- Confirm your foundation is level and rated for your model's loaded weight (Section 4.1 to 4.5)
- Confirm your electrician is scheduled and the dedicated circuit is planned (Section 4.6 to 4.10)
- Confirm clearance around the installation site (Section 4.11)
- Inspect the shipment for damage on arrival (Section 6.4)
Assembly
- Gather your tools (Section 7.1)
- Recruit two able-bodied adults for the work (Section 7.2)
- Follow the assembly sequence in your printed guide and Section 7.3
- Pair your assembly day with electrical work timing (Section 7.5)
First use
- Run the first fire-up procedure before your first session (Section 8.1)
- Load and test your stones (Section 8.5)
- Read the first session guidance (Section 9.1)
- Set up the WiFi controller if you have one (Section 8.3)
Ongoing
- Adopt the after-session routine (Section 10.1)
- Schedule weekly and monthly care (Section 10.2 and 10.3)
- Save support contact details for when you need help (Section 15)